Natural Gas Cogeneration

Current

navada-congeneration

NEVADA COGENERATION ASSOCIATES #2

Clark County, NV

Location:  Clark County, Nevada

Fuel:  Natural Gas

Capacity /Technology:  85 MW gas-fired combined cycle cogeneration facility

  • Three GE LM2500 combustion turbines
  • One GE steam turbine

Date Acquired:  October 2016

bayou-power-llc

BAYOU POWER

Orange, TX

Location: Orange, Texas

Fuel:  Natural Gas

Technical Description: 102 MW combined cycle cogeneration facility

Date Acquired:  May 2014

Exited

michiganpower

MICHIGAN POWER

Ludington, MI

Location:  Ludington, Michigan

Fuel:  Natural Gas

Capacity/Technology:  125 MW natural gas-fired combined cycle cogeneration plant

  • GE Frame 7EA Combustion Turbine
  • GE Steam Turbine

Date Acquired:  December 2015

Date Exited:  July 2018

gregory

GREGORY POWER PARTNERS

Gregory, TX

Location:  On a 10 acre site in Gregory, TX

Fuel:  Natural Gas

Capacity/Technology400 MW combined cycle cogeneration facility

  • Two GE 7FA natural gas-fired turbine generators
  • One steam turbine

Date Acquired:  June 2011

Date Exited:  August 2013

san-gabriel

SAN GABRIEL COGENERATION

Pomona, CA

Location:  On a 2 acre site in Pomona, CA

Fuel:  Natural Gas

Capacity/Technology49 MW combined cycle cogeneration facility

  • Natural gas-fired GE LM 5000 STIG 120 Gas Turbine
  • IHI Power Turbine
  • SCR for emissions control

Date Acquired:  January 2004

Date Exited:  June 2005

midland

MIDLAND COGENERATION VENTURE

Midland, MI

Location:  On a 1,200 acre site in Midland, MI

Fuel:  Natural Gas

Capacity/Technology1,500 MW simple cycle and 1.5MM lb/hr dual fuel cogeneration facility

  • 12 natural gas-fired turbine generators/heat recovery steam generators
  • Two steam turbines

Date Acquired:  July 2006

Date Exited:  May 2009

ripon

RIPON COGENERATION

Ripon, CA

Location:  On a 2 acre site three miles south of Ripon, CA

Capacity/Technology49 MW combined cycle and 200,000 lb/hr dual fuel cogeneration facility

  • Natural gas-fired GE LM-5000 STIG 120 Gas Turbine
  • IHI Power Turbine

Date Acquired:  January 2004

Date Exited:  June 2005

prime

PRIME ENERGY LIMITED PARTNERSHIP

Elmwood Park, NJ

Location:  On a 1.5 acre site leased from Marcal Paper Mills, Inc. in Elmwood Park, NJ

Capacity/Technology65 MW simple cycle and 200,000 lb/hr dual fuel cogeneration facility

  • Duel fuel fired 59 MW ABB GT-8BC Combustion Turbine Generator
  • 22 MW steam turbine generator (with no process steam)

Date Acquired:  October 2003

Date Exited:  December 2006

Start typing and press Enter to search