Natural Gas Combined Cycle

Current

grandtower

GRAND TOWER ENERGY CENTER

Grand Tower, IL

Location:  On a 300 acre site in Grand Tower, IL

Fuel:  Natural Gas

Capacity/Technology:  523 MW combined cycle facility

  • Two Siemens-Westinghouse Combustion Turbines
  • Two Nooter Eriksen Heat Recovery Steam Generators
  • Two Westinghouse Electric Corp. Steam Turbine Generators

Date Acquired:  January 2014

eaglepoint

EAGLE POINT POWER GENERATION

Westville, NJ

Location:  On a 10-acre site in Westville, NJ

Fuel:  Natural Gas

Capacity/Technology:  238 MW combined cycle natural gas-fired facility

  • One Alstom steam turbine
  • Two GE 7EA natural gas-fired turbine generators
  • Two heat recovery steam generators

Date Acquired:  April 2012

victoria-007

Victoria

Victoria, TX

Location:  Victoria, TX

Fuel:  Natural Gas

Capacity/Technology:   290 MW combined cycle natural gas-fired facility

Date Acquired:  June 2016

Exited

MACH GEN
PORTFOLIO

machgen-lz6rnnyh83ovtrjjy40wg977y7deq0uzw9bcimnmxy

ATHENS

Athens, NY

Location:  Athens, New York

Fuel:  Natural Gas

Capacity/Technology:  1,080 MW combined cycle natural gas-fired facility

Date Acquired:  February 2011

Date Exited:  November 2015

harquahala

HARQUAHALA

Tonopah, AZ

Location:  Maricopa County, Arizona

Fuel:  Natural Gas

Capacity/Technology:  1,092 MW combined cycle natural gas-fired facility

Date Acquired:  February 2011

Date Exited:  November 2015

millennium

MILLENNIUM

Charlton, MA

Location:  Charlton, Massachusetts

Fuel:  Natural Gas

Capacity/Technology:  360 MW combined cycle natural gas-fired facility

Date Acquired:  February 2011

Date Exited:  November 2015

dovetailproperty

LA PALOMA GENERATING PLANT

McKittrick, CA

Location:  McKittrick, CA

Fuel:  Natural Gas

Capacity/Technology:  1,022 MW combined cycle facility

  • Each plant consists of a gas compressor, an Alstom GT-24 combustion turbine, HRSG and a two-speed steam turbine
  • Four independently operated Alstom KA24-1 ICS combined cycle plants with automatic generator control
  • A 16-inch gas pipeline connects the Kern Mojave Pipeline to the facility

Date Acquired:  May 2010

Date Exited:  March 2018

pasco

PASCO POWER, LP

Pasco County, FL

Location:  Pasco County, Florida

Fuel:  Natural Gas and Fuel Oil

Capacity/Technology:  121 MW dual-fuel combined cycle facility

  • Two GE LM6000 combustion turbines
  • One GE steam turbine
  • Two Zurn HRSGs

Date Acquired:  November 2016

Date Exited:  March 2019

teesside

TEESSIDE POWER LIMITED

Durham, England

Location:  Durham, England

Fuel:  Natural Gas

Capacity/Technology: Teesside is located in Durham, England. The plant is configured as a 1,875MW combined-cycle, two 4+1 block with M701D5A gas turbines. The fuel is natural gas and the plant has been operational since 1993. The project has two surviving power offtake contracts with RWE Npower and EDF.

Date Acquired:  February 2004

Date Exited:  December 2004